KitLog pro

Powered By Kitlog Pro v2.0

ONEX #54 Web Site
' style=
Date:  12-3-2011
Number of Hours:  0.00
Manual Reference:  
Brief Description:  Finished loading shelves

Finished unpacking all the Onex kit boxes. Assigned a shelf for each kit section such at "W", "F" etc and stored all those items together. Also have them sorted on the shelf by dwg number where possible. Grouped smaller items in zip-lok bags to help find them later. The side and bottom skins are stored seperately because they are too long for this storage space. The spars w/box are stored to lower right of shelves with smaller skin sections on top of the spar box. The canopy and wing skins remain in their shipping boxes until needed. Also used an empty shelf to store what I have for instruments, electrical components, etc. Pretty much have all my misc. small aircraft related stuff is now in one place.

5 hours
' style=

Shelves loaded with kit components

Shelves loaded with kit components

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.